1)Ammonia Plant Phase II, Ghadir (ex Pardis) Petrochemical Company, Assaluye

Construction and precommissioning activities (as well as provision of all required services for commissioning)

* Owner: Petrochemical Industries Development    Management Company (PIDM Co.)
* Inspection: Petrochemical Industries Design and    Engineering Co. (PIDEC Co.)
* Volume/Scope of Work: Over 2.600.000 Manhours    covering:
- Erection of 4000 tons of steel structure,
- Erection of 5700 tons of mechanical equipment     (static & rotary),
- Prefab. & Erection of 200.000 in.dia Piping (up to 75mm thickness, carbon, alloy and stainless steel)
- Erection of 1350 tons of tanks (including ammonia tank),
- Erection of 2700 tons of reformer equipment,
- Execution of all related electrical & instrumentation works,
- Execution of all relevant painting & insulation activities,
- Precommissioning, and provision of all required services for Commissioning
* Start: Spring 2005
* Finish: Summer 2006 (in progress with delays due to lack of technical documents, materials, etc)
* Note: The Project has been transfered to Hamgaman through HAMPA Corporation, which has been    established by over 40 companies (including founders of HAMGAMAN) for this purpose.
 
 


2)  Cooling Tower of Ghadir Petrochemical Company, Bandar Imam

Engineering (Local), Procurement and Construction works (upto Commissioning)

* Owner: Ghadir Petrochemical Company (Through KAR-O-ANDISHE Eng. Co., one of the HAMGAMAN'S    founders)

* Inspection: Bina Consulting Engineers
* Scope of Work:
- Completion of detailed designs (by local engineering firms, especially for steel structure , concrete basin , piping , electrical and finishing activities , as well as control & instrument system) ,
- Provision of all required materials, including locally provided equipment and items,
- Construction Management (including selection and inspection on local contractors), - Precommissioning and Start up of completed tower.

*Start: Spring 2005
* Finish: Winter 2007

B- In Progress:

All Construction works of Gollestan Petrochemical Complex, Gorgan(Agh-ghalla).

* Owner: Gollestan Petrochemical Industries Company.

* Inspection: Namvaran Sanat Company (As MC)

* EPC Contractor: Hampa Eng. Corporation

* Scope of work:

Construction (including all civil and earth works), Precommissioning and provision of all required services for Commissioning of a Petrochemical Plant , designed to produce Urea & Ammonia.

* Start: Spring 2008

* Contractual Execution Time:48 months

 
 